Home › Projects › Jebel Ali Case Study
Case study · Logistics warehouse

Case Study: 110-Bay Used Pallet Racking for a Logistics Warehouse in Jebel Ali, Dubai

A recent project by our own installation team: 110 bays of quality used pallet racking at three heights (7 m, 6 m and 5 m), supplied and installed in 5 days, with column guards fitted and the racks handed over ready to load.

Get a Free Site VisitWhatsApp Us
Filmed on site after installation · Jebel Ali, Dubai

Project at a Glance

ItemDetails
ClientLogistics company (warehouse in Jebel Ali, Dubai)
SystemSelective pallet racking, quality used (full condition, max 1 year old)
Size110 bays
Rack heights7 m, 6 m and 5 m (three heights to suit the building and the stock)
SafetyColumn guards fitted at the aisle ends
Team10 Metalraking installers
Installation time5 working days
Completed2026

The Client's Need

The client is a logistics company that needed its warehouse in Jebel Ali ready for pallet storage quickly, with a clear budget. Like most logistics operators, they move a steady flow of palletised goods, so they needed straight, safe aisles for forklifts and as many pallet locations as the building could hold.

They chose quality used pallet racking: it costs less than new racking, it is available from stock, so there is no long factory lead time, and when it is in full condition it does the same job.

Our Solution

After a site visit and measurement, we planned the layout around the building and the goods, using three rack heights: 7 m, 6 m and 5 m. This puts taller runs where the height allows and lower runs where it does not, so no usable space is wasted.

We supplied the racking from our own used stock. Every upright, beam and accessory comes from closing warehouses, is no more than one year old, and is checked before it leaves our yard. Column guards were fitted to protect the uprights at the aisle ends.

Installation: 110 Bays in 5 Days

Our own team of 10 installers assembled, levelled and anchored all 110 bays in 5 working days. No subcontractors were used, which kept the quality and the schedule under our control. The racks were handed over ready to load, and the video above shows them in use.

Why This Matters for Your Warehouse

  • Speed: used racking from stock plus our own crew means a warehouse can go from empty to loaded in days, not weeks.
  • Cost: full-condition used racking gives you the same storage for a lower budget.
  • One supplier: layout, material and installation from one team, with one price.

This is one of more than 700 projects we have delivered across the UAE, from single storage rooms to full logistics and distribution centres. See more on our Projects page, or read about used racks for sale and our pallet racking systems.

Get a Free Quote

Tell us what you store and your warehouse size. Our team replies with a layout and a clear price.

Phone / WhatsApp: +971 50 434 6387
Office: Office 601-21, 6th Floor, Al Areej Business Centre, Muwaileh Commercial, Sharjah
Add more details (optional)
WhatsApp Us
CallWhatsAppFree Quote